Hoa Bac Cable-stayed Bridge: Construction of the Hoa Bac Cable-stayed Bridge started on January 15, 2001, and was completed on September 2, 2002.
The Cable-stayed Bridge stands as a magnificent feat of engineering, spanning 151.4 meters in length and 7.5 meters in width. With a load capacity of 8 tons, it is a testament to human innovation and determination. The completion of the Hoa Bac Cable-stayed bridge has brought joy to thousands of people in Hoa Bac commune, connecting them to three neighboring villages including Loc My, Nam Yen, An Dinh and fulfilling their long-held wishes.
This beautiful location offers a stunning vista from which to watch the sunset, reminding us of the beauty and majesty of nature.